This is the floor we install most often in basements and rental units, and increasingly in main living areas too, because it doesn't care about water the way wood or laminate do. The rigid SPC core resists dents from dropped pans and dog nails better than older flexible vinyl.
It floats over your existing floor in most cases, so if you've got old vinyl or tile you're tired of looking at, we usually don't need to tear it out first — that alone can shave a day off the job.
In most cases we float the new floor directly over existing vinyl, tile, or a level concrete slab, skipping demo entirely. We'll tell you upfront if your subfloor needs leveling first.
The 20 mil wear layer holds up under rolling office chairs and dog claws better than the 6 mil stuff sold at big-box stores, though a dropped cast iron pan will still leave a mark on anything.
We offer an attached cork or foam underlayment that cuts down on the hollow 'clack' sound vinyl plank is known for, especially noticeable on second floors.
An estimator walks the space, checks subfloor condition, and gives you a written number before anything is ordered.
Most in-stock lines ship within a week. Special-order finishes can take three to four weeks — we'll tell you which category yours falls into up front.
Furniture gets moved by the crew, old flooring comes out, and the new floor goes down. Average timeline is on the specs list above.
Your crew lead walks the room with you before packing up, so anything that needs a second look gets caught the same day.
The floor that gets refinished, not replaced.
The budget-friendly option that doesn't look budget.
Heavy planks that stay put without glue or clicks.
Soft underfoot, quiet, and warm in a Michigan winter.
Treads, risers, and nosing that match the floor they lead to.